Be the Candidate They Can't Ignore.

Don't just send a resume; set yourself up so the right work finds you.

  • Look like a pro instantly with a stunning personal brand.

  • Gain instant "Top Ten" status so you aren't just another name in a pile.

  • Wake up to booked meetings instead of "rejection" emails.

Join the Club — Free Forever

Accenture Construct - Data Center Construction Project Manager, ANS

  • Source: Accenture
  • Logic, Inc.
  • $150,000 to $200,000 /yr
  • On-site
  • La Porte
  • Full-Time
  • Senior

Job Description

Communications, Media & Technology - Data Center Full-Time Job No. 064b4df4-958d-4153-a37b-03319f2400c0 La Porte, IN

You’ve Never Been Satisfied with “Good Enough.”

You didn’t get into this to manage one piece of a project. You got into it to change how the world gets built.

At Accenture Construct, that’s the job. You’ll help deliver the data centers, power grids, rail networks, factories and public infrastructure that keep communities moving — smarter, safer and more sustainably.

You’ll work alongside people who think big and act bold: project managers, engineers, technologists and strategists who pair real-world delivery with AI. And you won’t be handed a slice of it. We take on whole programs, from early strategy through construction and handover, and we stand behind how they land.

Because “good enough” builds the past. You’re here to build what’s next.

Visit us here to learn more about Accenture Construct

As Accenture continues to grow, you may see a variety of new career opportunities, and depending on the role and location you may be directed to apply through Accenture LLP or one of our other legal entities - Accenture Construct LLC or Accenture Construct Inc., with benefits varying by country and role, so please check with your recruiter for details.

THE WORK:

  • You’ll assist with budget tracking, forecasting, invoice checks, accruals, and identifying project risks.
  • You’ll help standardize cost, schedule, and risk tracking processes.
  • You’ll prepare concise financial and risk updates for project teams and leadership.
  • You’ll review contractor agreements, flag budget gaps, and highlight early risks during preconstruction.
  • You’ll coordinate with scheduling and delivery teams to resolve issues quickly.
  • You’ll support variance reports, cash-flow forecasts, and leadership reviews.
  • You’ll link cost and schedule data for integrated project reporting.
  • You’ll deliver accurate outputs under senior guidance and travel to data center sites as needed.
  • Flexible: The work location for this role will include a mix of working remotely, onsite at a client or in an Accenture office or center
  • With all our roles, there is some in-person time for collaboration, learning and building relationships with clients, peers, leaders and communities. As an employer, we will be as flexible as possible to support your specific work/life needs.

$150,000 - $200,000 a year

Compensation at Accenture varies depending on a wide array of factors, which may include but are not limited to the specific office location, role, skill set, and level of experience. As required by local law, Accenture provides a reasonable range of compensation for roles that may be hired in Illinois, Maine, Minnesota, California, Colorado, District of Columbia, Maryland, Massachusetts, New York, New Jersey, Ohio, Virginia or Washington as set forth below.

HERE’S WHAT YOU’LL NEED:

  • 10+ years of experience in construction project controls
  • Bachelor’s degree in Engineering, Construction Management, or equivalent practical background
  • Strong knowledge of cost tracking, change orders, and risk fundamentals
  • Hands-on experience with Earned Value or resource-based data
  • Background in data center, manufacturing, or complex commissioning projects

BONUS POINTS IF YOU HAVE:

  • Excellent analytical skills, communication, and reporting organization
  • Experience supporting or helping negotiate project changes or claims
  • Prior experience in a project controls or cost management team environment
  • Exposure to multi-stakeholder or multi-project programs
  • Participation in implementing or improving project controls processes
  • Ability to analyze metrics and recommend efficiency improvements
  • Familiarity with Oracle Unifier or similar project management systems

La Porte, IN

Requesting an Accommodation

Accenture is committed to providing equal employment opportunities for persons with disabilities or religious observances, including reasonable accommodation when needed. If you are hired by Accenture and require accommodation to perform the essential functions of your role, you will be asked to participate in our reasonable accommodation process. Accommodations made to facilitate the recruiting process are not a guarantee of future or continued accommodations once hired.

If you would like to be considered for employment opportunities with Accenture and have accommodation needs such as for a disability or r…

Skills

  • accenture
  • oracle

Create Free Account & Apply
  • Free personal website
  • Built-in Talent Agent
  • Apply to future jobs in 1 click
  • Get matched to similar roles
or
Apply as a guest this time

You'll apply successfully, but won't be able to track your application, save this job, or get matched to similar roles.

This listing is a publicly available opportunity curated by Try Club to help talent discover relevant roles. Try Club is an independent platform and is not affiliated with Logic, Inc.

Get Similar Jobs

Browse more similar roles on TRY and find your perfect match.

Show Me Similar Jobs

Stop Searching. Start Thriving.

Why waste time chasing leads when the perfect projects can find you?
With TRY, clients actively searching for professionals with your skills can discover you in seconds. Whether it's a quick gig or your dream role, we connect you with opportunities that matter.

  • Get found faster
  • Let projects come to you
  • Build a career on your terms

Take control of your career today.

Claim Free Website in 2 Minutes